The facade has arrived at Sjølundvegen 1, in piles up on the roof to be prepared at the workshop with the best view..
2011/06/20
2011/06/16
2011/06/14
Subscribe to:
Posts (Atom)
The facade has arrived at Sjølundvegen 1, in piles up on the roof to be prepared at the workshop with the best view..
Category: project